Pre-assembled, containerized equipment skids that arrive ready to set and connect, cutting field assembly time on a tight schedule.

Talk to our team
Skid-mounted Systems

Skid-mounted Systems

Source pre-assembled, skid-mounted and containerized solar equipment systems that cut field assembly time. Skid fabrication services on Sunhub.

Pre-integrated equipment skids built in the shop

Pre-integrated in the shop, not the field

Inverters, switchgear and BOS components get mounted, wired and tested on a skid before it ever ships, moving hours of field electrical work into a controlled shop environment.

Containerized options for remote or repeat deployments

Fully containerized configurations suit remote sites or projects deploying the same equipment package repeatedly, where a standardized, transportable unit saves engineering time on every subsequent site.

Customized to the project's equipment mix

Skid layout and components get specified to the actual equipment list a project needs, not a generic pre-built configuration that requires field rework to match.

Less field time, standardized deployments

Cut field assembly time meaningfully

Shop-integrated skids arrive ready to set and connect, instead of hours of field wiring and testing.

Standardize repeat deployments

A validated skid configuration reuses across multiple sites without re-engineering each one from scratch.

FAQs

What equipment is typically skid-mounted for solar projects?

Skid-mounting is common for the balance-of-system electrical equipment that would otherwise be assembled in the field, such as inverters, transformers, switchgear, combiner and distribution gear, and controls, and sometimes battery storage. These components are integrated onto a common frame or into a container in the shop so the skid arrives ready to set and connect. The exact mix is built around the project.

How much field assembly time does a pre-integrated skid save?

Because the integration, wiring, and testing happen in the shop instead of on site, a pre-integrated skid can cut field assembly time substantially, arriving ready to set and connect rather than built up piece by piece. The actual savings depend on the scope packaged onto the skid and site conditions, but the biggest gains show up on tight schedules and repeat deployments.

Can a skid be customized for a specific project's equipment mix?

Yes. Skids are built around the project's own equipment mix rather than a fixed configuration, so the inverters, transformers, switchgear, and any storage are integrated to match what the design calls for. Standardizing that configuration also makes repeat deployments easier to reproduce across sites.